top of page
pcatechnologies01
Admin
More actions
Profile
Join date: May 20, 2025
Posts (38)
Jan 23, 2026 ∙ 4 min
Digital Multimeter and Silicone Tape Inside Switchgear Panels
Most electrical jobs don’t start with tightening or taping. They start with checking. Before hands get dirty, a Digital Multimeter is usually already out, probes resting on a panel door or hanging from a pocket. It’s not treated like a special instrument. It’s just part of the routine, like gloves or a torch. Later in the same job, when heat, sharp edges, and awkward clearances show up, Silicone High Voltage High Temperature tape quietly comes into play. No discussion. No debate. You just...
3
0
Jan 23, 2026 ∙ 4 min
Digital Clamp Meter and Insulation Testing During Switchgear Work
On most sites, meters come out before spanners. Before lugs are tightened or covers opened fully, someone is already checking load, continuity, or insulation. Tools like a digital clamp meter and a digital insulation tester become part of the job without much thought. They are not special tools. They are just always there, hanging from a belt or lying on a dusty panel top. You don’t really think about them until they give a reading that doesn’t feel right. When power is still live and work...
4
0
Jan 23, 2026 ∙ 3 min
GIS Bushing Installation Inside Switchgear Yards
When you start a job that involves a GIS bushing , the first thing you notice is weight and balance. On paper it looks manageable. On site, once it’s hanging on the crane hook, you realize small movements matter. A few millimeters off and the whole alignment feels wrong. Most of the time, the challenge is not electrical. It’s mechanical patience. You’re standing there, eyes moving between flange, gasket, and internal conductor, trying to make sure nothing is forced. If it needs force,...
3
0
bottom of page